Minnesota 1 Energy Park
Blue Earth, MinnesotaOnline
15 MW online80 MW in development · Q3 202795 MW at full build-out
- Type
- Building
- Online capacity
- 15 MW
- In development
- 80 MW · Q3 2027
- At full build-out
- 95 MW
- Substation
- Privately owned
- Use
- Colocation
- Location
- Blue Earth, Minnesota
- In service
- June 2025
- Internet
- Multiple 100G DIA and 100G Wave
The site
Expanding and thriving in Minnesota
At AAIM, we’re proud to call Minnesota home. The state’s vibrant community, robust infrastructure, and collaborative energy landscape make it the right setting for us to grow. We value our partnership with the local utility, working together to ensure our operations align with regional energy goals while maintaining efficiency and reliability for our clients.
Minnesota is more than a strategic location — it’s where innovation meets opportunity. Sited on Highway 169 near the Blue Earth Light and Water substation, the facility is positioned to take advantage of low-cost energy and the robust fiber connectivity provided by Bevcomm. At nearly 10,000 square feet, it is equipped to support demanding high-performance computing, enterprise data, and digital asset workloads.
The facility operates as a colocation site: clients bring their hardware, and we manage the infrastructure, energy, and connectivity around it. Its design prioritizes scalability and sustainability, reflecting a commitment to building data solutions that hold up over time for both clients and the environment.
An 80 MW expansion, in design
We’re not stopping here. Our team is currently developing and designing an 80 MW expansion at Blue Earth, built to Tier III standards — concurrently maintainable power and cooling, so the facility can be serviced without taking client load offline.
The project is in active design today, targeted for Q3 2027. As with every AAIM site, it is being engineered in-house, which means the same team that designs it will build and operate it.

An 80 MW expansion, designed to Tier III standards and targeted for Q3 2027.
If you are planning capacity on that horizon, talk to us early — we can shape a deployment around your power, density, and timing requirements while the design is still open.