Aerial view of AAIM's Missouri data center

Missouri Energy Park

MissouriOnline

10 MW online50 MW in development · Q3 202760 MW at full build-out

Type
Building
Online capacity
10 MW
In development
50 MW · Q3 2027
At full build-out
60 MW
Substation
Privately owned
Use
Colocation
Location
Missouri
In service
October 2024
Internet
Multiple 100G DIA and 100G Wave

The site

Building on history, powering the future

At AAIM, we pride ourselves on creating sustainable and innovative solutions while staying connected to the communities we serve. Our Missouri project is a clear example of these values in action — combining forward-thinking technology, environmental stewardship, and local impact.

The facility stands on the site of what was once a large clay brick plant, a landmark rooted in the area’s industrial history. By repurposing this location, we’ve breathed new life into a space that holds historical and cultural significance. This approach reflects our dedication to preserving the past while building for the future, blending Missouri’s heritage with modern infrastructure.

Aerial view of the Missouri facility: a long louvered building with its line of transformers inside a fenced gravel compound

The facility and its transformer line, inside the secured compound.

What makes this project distinctive is our use of stranded electricity.

We turned stranded energy into a dependable power source for high-density compute.

Rather than allowing those resources to remain untapped, we’ve put them to work. This commitment to reusing available resources enhances operational efficiency and reduces environmental impact while delivering world-class infrastructure.

Our investment doesn’t stop with the facility itself. We believe in supporting the communities where we operate, and Missouri has given us an exceptional opportunity to do so. By hiring locally, we’ve created jobs that help drive economic growth and strengthen connections within the region. This project isn’t only about technology — it’s about people, heritage, and a shared vision for progress.

The next 50 MW

A further 50 MW is in development at the site, targeted for Q3 2027 — six times what is energized there today.

Aerial rendering of the Missouri expansion: a data hall with rows of racks, a generator yard with an above-ground fuel tank, two substations and medium-voltage buildings, staff parking, and a secured perimeter

Rendering of the planned expansion.

The rendering shows how the campus is laid out: the data hall at the centre, a generator yard and above-ground fuel tank along the north edge, and two substations with their own medium-voltage buildings feeding the site from separate positions. Parking and the visitor approach are kept outside the secured perimeter, with the whole compound fenced.

As with the existing facility, it is being designed, built, and operated by our own team. If you are planning capacity for 2027, talk to us while the layout is still open.

Get in touch

Interested in Missouri Energy Park?

Send us your requirements and we will walk you through available capacity, power, and lead times.